Manu J. Nair
CEO
Sardar ex-ISRO
Launch Vehicles
PRE-HOT-FIRE — milestone window has passed without public confirmation
PRE-HOT-FIRE — milestone window has passed without public confirmation
Vehicle: Razor Crest Mk-1 — medium-lift, fully reusable both stages
Engines: 9x Stallion booster + 15x Pegasus upper stage — see engine_programmes
Reuse mechanism: The Full-Flow Segregated Cooling Cycle uses the engine feed system to manage upper-stage re-entry heating rather than relying on heavy heat shielding. This is the specific technical claim that distinguishes them from Falcon 9's booster-only reuse.
Payload — Expendable: 24.8 t to LEO
Payload — Partially reusable: 22.8 t
Payload — Fully reusable: ~8 t
Payload — Extended: GTO and TLI capability claimed
Target pricing: $350–$2,000 per kg depending on configuration and cadence
Base 001: Tamil Nadu engine test site, focused on upper-stage qualification
Andhra campus: 150-acre manufacturing and testing campus in Andhra Pradesh's proposed space city, operational from mid-2026 for integrated engine and stage testing
Total raised: ~$25.5 million
Valuation: $80.5 million (5.5x uplift from the $14.6M August 2024 seed valuation)
Latest round: $20.5M oversubscribed Series A, January 2026, led by TDK Ventures and BIG Capital
Investors — TDK Ventures
Investors — BIG Capital
Investors — Accel
Investors — Prosus
Investors — YourNest
Investors — BlueHill Capital
Investors — Campus Fund
Investors — Riceberg Ventures
Cap table: BIG Capital 12.11%, YourNest 11.64%, Campus Fund 10.25%, BlueHill 8.38%, TDK Ventures 6.21%, Accel and Prosus 0.62% each. Nair, Sardar and Sharma hold 13.04% each.
Financials fy25: Pre-revenue. ₹1.1 crore non-operating income; net loss ₹4.2 crore.
Hot fire: Targeted June–July 2026. NOT CONFIRMED AS OF 16 AUGUST 2026 — the window has closed with no public announcement. Treat as slipped until proven otherwise.
Tdv flight: November–December 2027
Commercial: Late 2028, 5–6 missions/year initially
Note: One aggregator lists Stallion at 925 kN and a TDV in 2026. Both conflict with primary reporting. Use the 1.2 MN and 2027 figures.
Commercial: ~$130 million in signed launch MoUs including Japan's Space BD and Taiwan's TASA
Imported from IFSC Archive dataset v5.0, research snapshot 2026-08-16.
CEO
Sardar ex-ISRO
COO
Sardar ex-ISRO
CTO
Sardar ex-ISRO
founding